Lockout/tagout procedures

A written, approved lockout procedure for every machine, printed and inspected every year.

Write an energy control procedure for each piece of equipment, with every isolation point, its device, how to verify it and a photo. Procedures are approved before use and revised with a record of what changed. Print a color-coded sheet for the machine, and record the periodic inspection the standard asks for at least once a year.

A lockout/tagout procedure in EHS Nation with color-coded energy isolation points, devices and verification steps

On the plant floor

DangerHazardous energy

Hydraulic press 4

Switching a machine off doesn't make it safe. Stored pressure, springs and a raised ram can still move it, so servicing needs a written lockout procedure for the machine.

29 CFR 1910.147

What EHS Nation does

A procedure for this press with every isolation point color-coded and photographed, approved before use, inspected periodically, and a QR tag on the machine that opens it.

What it does

Inside Lockout (LOTO)

One procedure per machine

Each procedure belongs to a piece of equipment, with its asset number and location, so the steps are specific to that machine.

Every energy source, color-coded

Electrical, pneumatic, hydraulic, water, steam, gas, chemical, mechanical, thermal, gravity and stored energy, each with its own color and tags like E-1 and W-2.

Isolation points with photos

For each point: the source and its magnitude, where and how to isolate it, the lockout device, how to verify it and a photo.

Steps that start written

New procedures start with general steps for applying the lockout, the try-out and removing it, which you edit for the machine.

Approved before use

A procedure can't go for approval until every point says where and how to isolate it. Each revision is numbered and says what changed.

A sheet and a tag for the machine

Print a one-page sheet with your logo and the color-coded points, and a QR tag for the equipment. Scanning it opens the procedure, its inspections and a report already filled in.

Periodic inspections

Record who was watched, by which authorized employee, the findings and the outcome. The next one is due a year later, or sooner if you choose, and the list warns 30 days ahead.

Copy for similar equipment

Start the procedure for the next machine from a copy of one you already wrote, photos included, and filter the list by energy type.

Retired, not deleted

When a machine goes, retire its procedure. It leaves the working list but stays on record, with its revisions and inspections.

A closer look

One sheet per machine, color-coded by energy, with a QR code to the live procedure.

A printed lockout/tagout procedure sheet with color-coded isolation points and a QR code
  • 01A current procedure at every machine
  • 02Every energy source accounted for
  • 03Annual inspections that don't slip

Regulations and standards

The rules behind it

Summaries on this site are in our own words. Follow a link to read the official text. EHS Nation helps you keep records and run your program; it doesn't replace your own judgment or legal advice.

Next step

See EHS Nation with your own sites and forms.

Book a demo and we'll walk through the platform with your locations, your forms and your questions. No slides, no pressure.

  • About 30 minutes
  • Your sites and forms
  • No slides