Risk, JHA, permits to work & change

Control of work from risk register to permit board, with nothing left to memory.

A company risk matrix, a risk register with bow-ties, job hazard analyses crews actually read, and permits to work with isolations, gas tests and sign-on. Management of change brings sign-offs and a pre-startup safety review into one record.

The live permit board showing active hot work and confined space permits

On the plant floor

WarningFall from height

The mezzanine edge

In general industry, a walking surface with an unprotected edge 4 feet or more above the level below needs fall protection, such as a guardrail.

29 CFR 1910.28(b)(1)

What EHS Nation does

A job hazard analysis the crew is briefed on and signs, permits to work with their precautions, and the guardrail on an inspection that's scheduled and tracked until it's done.

DangerConfined space

The process water tank

The air inside can be fine one minute and deadly the next, and many of the people who die in confined spaces went in to rescue someone else. Entry needs a permit, testing and an attendant.

29 CFR 1910.146

What EHS Nation does

A confined space permit with its precautions and gas tests, and crew sign-on that only works for people whose required training is current.

What it does

Inside Risk & permits

Your risk matrix

Any size from 3×3 to 6×6 with your own words and colors, used everywhere a risk is scored.

Risk register and bow-ties

Threats, preventive and mitigating barriers and consequences, drawn from the register and kept current.

Job hazard analysis

Steps, hazards and controls from a reusable step library, an editor that saves as you go, and crew briefings with sign-off.

Permits to work

Hot work, confined space and more, with precautions, lock-and-verify isolations, gas tests, fire watch, extensions and automatic expiry.

Clash detection and crew sign-on

Overlapping permits in one area are flagged. Crew sign on from 15 minutes before start, and only if their required training is current.

Management of change

Sign-off slots, risk before and after, and a pre-startup safety review that must pass before the change goes live.

A closer look

Bow-ties link threats, barriers and consequences to the risk they control.

A bow-tie diagram linking threats, barriers and consequences for a risk
  • 01One live picture of the work underway
  • 02Isolations verified by a second person
  • 03Changes reviewed before start-up, not after

Regulations and standards

The rules behind it

Summaries on this site are in our own words. Follow a link to read the official text. EHS Nation helps you keep records and run your program; it doesn't replace your own judgment or legal advice.

Next step

See EHS Nation with your own sites and forms.

Book a demo and we'll walk through the platform with your locations, your forms and your questions. No slides, no pressure.

  • About 30 minutes
  • Your sites and forms
  • No slides